3

Handy for de shops. And school.

Handy for de shops. And school.
t’s another Irish Daily Star planning notice, so you know it’s a big one
that the developers would really rather the neighbours don’t hear about.
It’s a prime plot that’s pretty surrounded by housing estates, with Charnwood and Sans Souci Wood just over the hedge, so the development may not change all that much about this fairly central Bray location.
Construction of 91 dwelling units comprising o 42 no. apartments in one 4/5 storey block containing 18 no. 1 bed units, 22 no. 2 bed units and 2 no. 3 bed units; o 28 no. duplex units in 3 no. 3 storey blocks containing 14 no. 2bed units and 14 no. 3 bed units; and o 21 no. 3 storey 4 bed houses in three terraced rows • 120 no. car parking spaces inclusive of
4 no. accessible spaces, 8 no. EV parking spaces, and 2 no. shared car parking spaces • 152 no. bicycle parking spaces • provision of 2,962 sqm of public open space (inclusive of play area), 670 sqm of communal open space and private open space • a vehicular and pedestrian entrance to the site at Church Road, 2 no. pedestrian entrances from Churchlands and 1 no. pedestrian entrance from Vevay Road • all associated site development works, landscaping, boundary treatment, bins stores and services including new water main connection and foul and surface water drainage, and the provision of 1 no. ESB substation.